Before Placing the Deck or Shed, Read the Easement
Check registered rights and the actual site layout before locating a deck or shed. Zoning setbacks, property boundaries, easements and utility locates answer different questions.
Read the guideGuides 1-12 of 22 · Page 1 of 2

Check registered rights and the actual site layout before locating a deck or shed. Zoning setbacks, property boundaries, easements and utility locates answer different questions.
Read the guide
A signed change order settles price and scope with the contractor. Changes to approved construction also need the designer and municipality to determine the required review.
Read the guide
Compare a compliant redesign with the actual benefit of a variance. Start with a verified zoning list, then weigh usable space, application work and uncertainty.
Read the guide
A finished renovation and a closed permit are different milestones. Verify every relevant permit, resolve outstanding inspections and keep the municipality’s confirmation.
Read the guide
Keeping a tree does not remove construction risk to it. In Toronto, access, storage, excavation and soil changes can trigger tree-protection requirements before work begins.
Read the guide
Use a house-specific energy evaluation to choose the order of upgrades. Coordinate repairs, access, air sealing, insulation, windows and ventilation before buying isolated improvements.
Read the guide
Plan a renovation bin in Toronto public space with the correct street occupation approval, placement drawing and collection dates.
Read the guide
Compare condo flooring sound documentation with the actual floor and ceiling assembly, not just a large number on an underlay package.
Read the guide
Resolve condominium permissions, unit boundaries, service shutdowns and building access before ordering a renovation.
Read the guide
Check the designation and identified heritage attributes before changing interior trim, stairs, walls or other features in an Ontario heritage property.
Read the guide
Find the correct municipal noise category and permitted hours before scheduling renovation work, deliveries and weekend tasks.
Read the guide
The delivery truck is early and the kitchen is not ready. A garage full of beautiful boxes needs a better plan than “they will probably be fine.”
Read the guide