The marble rolls toward the hallway. The long straightedge barely rocks. Both observations can be true, and they do not call for exactly the same repair.

Agree on the result you are buying

MAPEI's substrate guide distinguishes checking the substrate from selecting preparation products. Ask the installer to map high and low areas and explain the finish manufacturer's flatness requirements. A bag labelled self-levelling is not a diagnosis.

Follow the new height to every edge

Bringing a whole sloping room level can add material, weight, and height at the low side. We mark the proposed finished height at each doorway before agreeing on the pour. A thin sample of the chosen tile and its planned assembly helps you see the transition instead of trying to picture several layers from a number on the quote. Check doors, stairs, adjoining floors, and appliance openings. Have unexplained movement or suspected structural problems assessed before covering them. The preparation product must also be suitable for the substrate and proposed thickness.

Before the next step

  • Ask for measured high and low points.
  • Separate the flooring requirement from a structural concern.
  • Approve the doorway and appliance transitions before pouring.

Write 'flat', 'level', or both into the agreed scope, with the finished heights at the edges. In a kitchen, make one more check before adding layers: will the dishwasher still come out afterward?