When the outer row spreads, look below the visible edge before adding joint sand. The restraint may be missing, loose or sitting on the wrong layer. If the border also sinks, the base or drainage may be part of the repair.
The edge restraint belongs on the base
Side view: restraint and layers
The restraint holds the outside row against sideways movement. It needs the specified base support and anchorage; soil piled against a loose edge is not an equivalent detail.
Top view: follow the spreading
A fanning joint can identify where paving is spreading, but it cannot establish why. Check restraint, drainage and base movement before choosing a joint product.
A conventional sand-set pavement is shown schematically. Permeable systems and project-specific bases use different assemblies. Layer depths, materials and restraint details come from the selected system and site design. Unilock patio installation guidance.
Unilock's on-grade patio guide places the edge restraint on the base course, not the bedding course. The distinction matters: bedding levels the pavers, while the base supports the assembly. Edging pressed into loose bedding or garden soil can move along with the stones it is meant to hold.
| Visible pattern | Check beneath or beside it |
|---|---|
| Joints widen toward the lawn; heights remain similar | Restraint continuity, attachment and support beneath it |
| Border drops and opens | Base loss, weak edge support or water washing material away |
| Pavers rise against a fixed edge | Movement or pressure elsewhere in the field |
| Only one broken corner moves | Local damage and support, while checking adjacent units |
Expose enough to understand the boundary
Photograph the edge with a straight reference line and note whether the movement changes after rain. An installer can carefully expose a short section to identify the restraint, bedding, base and surrounding soil without disturbing a larger area unnecessarily. Keep excavations away from services and other structures until their positions are known. Do not use loose stones against the border as a substitute for a defined restraint. Look for broken restraint, loose fixings and bedding spilling into the garden; a visible plastic strip alone does not establish that the edge is supported.
A useful repair scope says which pavers are lifted, how the support and drainage are restored, which restraint fits the paving/base system, how joints are reinstated and where the final surface sends water. Photograph the rebuilt edge before soil or sod hides it. The finished border should remain aligned without relying on a mound of mulch to push it back.
Where a retaining wall supports the patio edge, treat the wall as its own structure. A leaning wall or a dropped area behind it is more than a missing plastic strip. Keep the area out of use if support appears unstable and have the wall and paving assessed together.
If water carries material out of the joints, investigate joint-sand washout. If a wall holds up the edge, use the separate leaning retaining-wall guide.
Check whether the edge is opening or sinking
Look along the border and compare joint widths with the middle of the patio. Note whether the outside units tilt, settle or slide outward. Check for wheel traffic, an eroded garden edge or a changed ground level beside the paving. Keep furniture away from unstable units and mark a trip hazard until repaired. A decorative border is still part of the supported pavement.
If furniture keeps catching after the edge is sound, Patio Furniture Legs Keep Catching in the Joints separates a chair-foot problem from paving movement.
Rebuild the edge as part of the paving system
The repair should restore base support, alignment, restraint and joints in the correct sequence for the selected system. Avoid building an arbitrary mortar lump around the outside; the detail must suit the pavement, drainage and nearby planting. Check the finished edge with the intended traffic and keep heavy wheels away if the patio was not designed for them. Repeated movement deserves a wider investigation than another line of joint sand.
Before you finish
- Distinguish sliding from settlement.
- Photograph the exposed edge construction.
- Check adjacent drainage before closing the repair.

